Technology <<< >>> Solutions
Time, scheduling and coordination between classes was problematic.
This project was a lot of work, and the
benefit was not so dramatic as we had hoped.
The two groups had few students in common, and the benefit was diluted.
Transfer of data and speed of collection was problematic.
We needed more samples for the analysis to have more meaning.